1.3 MW Hydro operating in Trinity, CA
1.3 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1984
Operating Since
Coordinates
40.1998, -123.5231
County
Trinity, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Grizzly Mountain Ranch | — | — |
| Owner(s) | Grizzly Mountain Ranch | — | — |
| Status | Operating | — | — |
The Three Forks Water Power Project is a hydroelectric generating facility located in Trinity County, California. The plant has a total capacity of 1.3 MW and began operating in 1984. It is owned and operated by Grizzly Mountain Ranch. The facility utilizes a single generator and conventional hydroelectric technology, drawing power from water (WAT) as its primary fuel source.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year of data, the Three Forks Water Power Project generated 2,641 MWh of electricity, achieving a capacity factor of 23.4%. Based on its generating capacity, the plant ranks 236th out of 247 power plants in California and 1360th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
10 MWh
Latest Month
2.6K MWh
Annual Generation
23.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
FRTSWRD_6_GN001
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Three Forks Water Power ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.