Search plants, projects, owners, and states
6.5 MW Sub. Coal operating in Polk, MN
6.5 MW
Nameplate Capacity
2
Generators
units
Conventional Steam Coal
Technology
1954
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
47.7647, -96.6334
Reference point reported to EIA.
County
Polk, MN
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 2.069 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | American Crystal Sugar Co | — | — |
| Owner(s) | American Crystal Sugar Co | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The American Crystal Sugar Crookston plant is a 6.5 MW conventional steam coal facility located in Polk County, Minnesota. It began operating in 1954 and has two generators. The plant is owned and operated by American Crystal Sugar Company. It is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority and resides within the MRO NERC region.
In the most recent year of reported data, the plant generated 43,157 MWh of electricity, achieving a capacity factor of 75.3%. This output ranks it as the 7th largest coal-fired power plant in Minnesota out of 8 such plants, and 86th nationally out of 89. The plant's primary fuel source is subbituminous coal (SUB).
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.4K MWh
Latest Month
43.2K MWh
Annual Generation
75.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1217 lb/MWh
NOx
2 lb/MWh
SO₂
0.505 lb/MWh
CH₄
0.138 lb/MWh
N₂O
0.020 lb/MWh
Capacity Factor
82.2%
Annual Net Gen
47 GWh
CO₂eq
1226 lb/MWh
Subregion
MRO West
No financial data available for this plant.
This is the open data foundation underneath InfraSure's analytical layer — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Crookston American Sugar Subdivision · 42 kV
Substation Distance
1.588 km
Operator
Otter Tail Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
OTP.OTPW_2.AZ
Pricing Hub
MINN.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
American Crystal Sugar Drayton
Data-driven briefing on American Crystal Sugar — fleet, generation, financial, and news signals.
American Crystal Sugar Moorhead
Data-driven briefing on American Crystal Sugar — fleet, generation, financial, and news signals.
NVE-Company MN
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
American Crystal Sugar Hillsboro
Data-driven briefing on American Crystal Sugar — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.