65 MW Black Liquor operating in Cass, TX
65 MW
Nameplate Capacity
2
Generators
units
Wood/Wood Waste Biomass
Technology
1972
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.2552, -94.0699
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Cass, TX
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
2 mapped line sections connect the two facilities over 11.781 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Graphic Packaging International - Texarkana | Graphic Packaging International | — |
| Owner(s) | Graphic Packaging International - Texarkana | Graphic Packaging Holding | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The International Paper Texarkana Mill is a 65 MW biomass power plant located in Cass County, Texas. The plant, which began operating in 1972, is owned by Graphic Packaging Holding and operated by Graphic Packaging International - Texarkana. It utilizes wood and wood waste biomass (BLQ) as its primary fuel source and consists of two generators.
The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In the most recent year of data, the International Paper Texarkana Mill generated 336,718 MWh of electricity, achieving a capacity factor of 59.0%. It ranks as the largest of three biomass plants in Texas and 38th out of 66 biomass plants nationally.
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
36.0K MWh
Latest Month
336.7K MWh
Annual Generation
59.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
253 lb/MWh
NOx
0.946 lb/MWh
SO₂
2 lb/MWh
CH₄
0.113 lb/MWh
N₂O
0.025 lb/MWh
Capacity Factor
66.4%
Annual Net Gen
378 GWh
CO₂eq
263 lb/MWh
Subregion
SPP South
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $227.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPPSOUTH_HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesGSPP Held LLC CSG
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
NE Renewable Power West Enfield
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GSPP 409 Ferris Road
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GSPP Imholte CSG
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.