59 MW Muni. Waste operating in Lee, FL
59 MW
Nameplate Capacity
2
Generators
units
Municipal Solid Waste
Technology
1994
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
26.6317, -81.7609
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Lee, FL
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 1.990 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lee County Board-Commissioners | Reworld Holding | — |
| Owner(s) | Lee County Board-Commissioners | Lee County Board of Commissioners | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Lee County Solid Waste Energy is a 59 MW waste-to-energy plant located in Lee County, Florida. The plant began operating in 1994 and utilizes two generators powered by municipal solid waste (MSW). It is owned and operated by the Lee County Board of Commissioners. The plant's balancing authority is Florida Power & Light Company, and it falls within the SERC NERC region.
In the most recent year of reported data, Lee County Solid Waste Energy generated 302,436 MWh of electricity, achieving a capacity factor of 58.5%. Among similar MSW plants in Florida, it ranks 5th out of 9, and nationally it ranks 15th out of 56.
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Municipal
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
14.1K MWh
Latest Month
302.4K MWh
Annual Generation
58.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2110 lb/MWh
NOx
4 lb/MWh
SO₂
3 lb/MWh
CH₄
1 lb/MWh
N₂O
0.176 lb/MWh
Capacity Factor
53.0%
Annual Net Gen
274 GWh
CO₂eq
2194 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $206.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Lee County commissioners publicly considering a second WTE incinerator to keep pace with population and waste growth; no formal approval taken and environmental groups have raised objections.
source