Search plants, projects, owners, and states
6.7 MW Hydro operating in Oxford, ME
6.7 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1988
Operating Since
Coordinates
44.9432, -71.0060
County
Oxford, ME
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brookfield White Pine Hydro LLC | — | — |
| Owner(s) | ARCO | — | — |
| Status | Operating | — | — |
The Aziscohos Hydroelectric Project is a 6.7 MW hydroelectric power plant located in Oxford County, Maine. It began operating in 1988 and has a single generator. The plant is owned and operated by Brookfield White Pine Hydro LLC. Its primary fuel source is water (WAT), and it utilizes conventional hydroelectric technology.
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year with available data, the Aziscohos Hydroelectric Project generated 36,269 MWh of electricity, achieving a capacity factor of 61.7%. The plant ranks 27th out of 51 power plants in Maine and 785th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
2.7K MWh
Latest Month
36.3K MWh
Annual Generation
61.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $15.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Aziscohos Hydroelectric ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.