Search plants, projects, owners, and states
6 MW Pet. Coke operating in Lucas, OH
6 MW
Nameplate Capacity
1
Generators
unit
Petroleum Coke
Technology
1986
Operating Since
Coordinates
41.6325, -83.5042
County
Lucas, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Toledo Refining Company | — | — |
| Owner(s) | Toledo Refining Company | — | — |
| Status | Operating | — | — |
The Toledo Ref Power Recovery Train is a 6 MW power plant located in Lucas County, Ohio. The plant, which began operating in 1986, is owned and operated by the Toledo Refining Company. It utilizes petroleum coke (PC) as its primary fuel source and consists of a single generator.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In the most recent year of reported data, the Toledo Ref Power Recovery Train generated 10 MWh of electricity, resulting in a capacity factor of 0.0%. The plant is ranked as the smallest petroleum coke plant in Ohio (1 of 1) and the sixth smallest in the United States (6 of 7).
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
0 MWh
Latest Month
10 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1284 lb/MWh
NOx
4 lb/MWh
SO₂
10 lb/MWh
CH₄
0.038 lb/MWh
N₂O
0.008 lb/MWh
Capacity Factor
2.7%
Annual Net Gen
1 GWh
CO₂eq
1287 lb/MWh
Subregion
RFC West
No financial data available for this plant.
This is a small open-data project — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
SUNOIL_T69 KV TR7
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Toledo Ref Power Recovery Train