Search plants, projects, owners, and states
76.5 MW Muni. Waste operating in Pinellas, FL
76.5 MW
Nameplate Capacity
2
Generators
units
Municipal Solid Waste
Technology
1983
Operating Since
Coordinates
27.8733, -82.6741
County
Pinellas, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Reworld Projects, LLC | Reworld Projects | — |
| Owner(s) | Pinellas County | EQT | — |
| Status | Operating | operating | — |
The Pinellas County Resource Recovery facility is a 76.5 MW waste-to-energy plant located in Pinellas County, Florida. The plant began operating in 1983 and utilizes municipal solid waste (MSW) as its primary fuel source. It consists of two generators employing MSW technology. The facility is owned by EQT, a company based in Sweden, and operated by Reworld Projects, LLC. It is the second-largest waste-to-energy plant in Florida (out of 9) and the seventh-largest in the United States (out of 56).
The plant operates within the Progress Energy Florida balancing authority and the SERC NERC region. In the most recent year with available data, the Pinellas County Resource Recovery facility generated 339,033 MWh of electricity, achieving a capacity factor of 50.8%.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Progress Energy Florida (FPC)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
10.3K MWh
Latest Month
339.0K MWh
Annual Generation
50.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
2265 lb/MWh
NOx
6 lb/MWh
SO₂
3 lb/MWh
CH₄
1 lb/MWh
N₂O
0.191 lb/MWh
Capacity Factor
63.9%
Annual Net Gen
428 GWh
CO₂eq
2356 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $267.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26
View all 5 articlesNo Ask reports yet for this entity.
Ask about Pinellas County Resource Recovery