88.5 MW Wind operating in Kern, CA
88.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1989
Operating Since
Coordinates
35.0450, -118.2642
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Terra-Gen Operating Co-Wind | Terra-Gen | — |
| Owner(s) | Terra-Gen Operating Co-Wind | Terra-Gen | — |
| Status | Operating | operating | — |
GEM identifies the owner as Terra-Gen
This entity is not yet in the GEM ownership database — chain unavailable.
Mojave 16/17/18 is an 88.5 MW wind power plant located in Kern County, California. The plant began operating in 1989 and utilizes onshore wind turbine technology. It has one generator. The plant's primary fuel source is wind (WND). Terra-Gen Operating Co-Wind is the owner and operator.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year with available data, the plant generated 73,909 MWh, achieving a capacity factor of 9.5%. Mojave 16/17/18 ranks as the 32nd largest wind power plant in California out of 116, and 785th nationally out of 1424.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3.4K MWh
Latest Month
73.9K MWh
Annual Generation
9.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $167.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
CAISO
LMP Node
WSTWND_7_N007
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Mojave 16/17/18