Search plants, projects, owners, and states
1 MW Hydro operating in Kennebec, ME
1 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1985
Operating Since
Coordinates
44.2218, -69.7857
County
Kennebec, ME
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | KEI (Maine) Power Management (III) LLC | — | — |
| Owner(s) | KEI (Maine) Power Management (III) LLC | — | — |
| Status | Operating | — | — |
The Gardiner hydroelectric plant is located in Kennebec County, Maine. The plant has a total capacity of 1 MW across one generator. It began operating in 1985 and is owned and operated by KEI (Maine) Power Management (III) LLC. The primary fuel source for the plant is water (WAT), and it utilizes conventional hydroelectric technology.
Gardiner operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In the most recent year of reported data, the plant generated 4,300 MWh of electricity, achieving a capacity factor of 48.0%. In terms of size, Gardiner ranks as the 49th largest out of 51 power plants in the state of Maine, and 1433rd nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
545 MWh
Latest Month
4.3K MWh
Annual Generation
48.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $2.3M
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.BROWN_CR12.5
Pricing Hub
.Z.MAINE
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Gardiner