94.5 MW Conventional Hydroelectric (6 MW) + Wood/Wood Waste Biomass (88 MW) operating in Carlton, MN
94.5 MW
Nameplate Capacity
7
Generators
units
Hybrid (2)
Technology
Conventional Hydroelectric + Wood/Wood Waste Biomass
1929
Operating Since
Coordinates
46.7243, -92.4298
County
Carlton, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sappi Cloquet LLC | Sappi Cloquet LLC | — |
| Owner(s) | Sappi Cloquet LLC | Sappi | — |
| Status | Operating | operating | — |
The Sappi Cloquet Mill is a 94.5 MW hybrid power plant located in Carlton County, Minnesota. The plant, which began operating in 1929, is owned by Sappi, a South Africa-based company, and operated by Sappi Cloquet LLC. The facility utilizes both conventional hydroelectric and wood/wood waste biomass technologies. It consists of seven generators powered by water and wood.
The Sappi Cloquet Mill operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. In the most recent year of data, the plant generated 443,349 MWh of electricity, achieving a capacity factor of 53.6%. It ranks as the largest of 24 biomass and hydro plants in Minnesota, and 203rd out of 1464 such plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
35.0K MWh
Latest Month
443.3K MWh
Annual Generation
53.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
120 lb/MWh
NOx
0.657 lb/MWh
SO₂
3 lb/MWh
CH₄
0.095 lb/MWh
N₂O
0.027 lb/MWh
Capacity Factor
54.9%
Annual Net Gen
454 GWh
CO₂eq
130 lb/MWh
Subregion
MRO West
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $330.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Potlatch 115KV Substation · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 9 articlesNo Ask reports yet for this entity.
Ask about Sappi Cloquet MillForward forecasts, scenario decomposition, and risk-decision tooling for this asset.