Search plants, projects, owners, and states
Retired in December 2024, according to EIA. Last listed as operating or planned in January 2026. EIA-860M · Sep 2026
13.1 MW Muni. Waste in MARION, OR
13.1 MW
Nameplate Capacity
1
Generators
unit
Municipal Solid Waste
Technology
1986
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
45.0485, -122.9628
Reference point reported to EIA.
County
MARION, OR
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 7.231 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Covanta Marion Inc | Reworld Marion Inc | — |
| Owner(s) | Covanta Marion Inc | EQT | — |
| Status | Retired | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Covanta Marion Inc is a 13.1 MW waste-to-energy power plant located in Marion County, Oregon. The plant began operating in 1986 and utilizes municipal solid waste (MSW) as its primary fuel source. It consists of a single generator and is operated by Covanta Marion Inc, a subsidiary of the Swedish company EQT. The plant is interconnected to the grid within the Portland General Electric Company balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
Covanta Marion Inc is the largest waste-to-energy plant in Oregon, ranking 1 out of 1 in the state. Nationally, it ranks 50 out of 56 similar facilities. The plant has been the subject of 9 news articles, with a focus on regulatory (7 articles) and industry (2 articles) topics.
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Portland General Electric Company (PGE)
Grid Voltage
57.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2392 lb/MWh
NOx
7 lb/MWh
SO₂
4 lb/MWh
CH₄
2 lb/MWh
N₂O
0.201 lb/MWh
Capacity Factor
42.5%
Annual Net Gen
49 GWh
CO₂eq
2488 lb/MWh
Subregion
WECC Northwest
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $45.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 7 articlesNo Ask reports yet for this entity.
Ask about Covanta Marion IncForward forecasts, scenario decomposition, and risk-decision tooling for this asset.