Search plants, projects, owners, and states
11.2 MW Landfill Gas operating in Broward, FL
11.2 MW
Nameplate Capacity
4
Generators
units
Landfill Gas
Technology
1989
Operating Since
Coordinates
26.2881, -80.1672
County
Broward, FL
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WM Renewable Energy LLC | WM Renewable Energy | — |
| Owner(s) | WM Renewable Energy LLC | Waste Management | — |
| Status | Operating | retired | — |
CSL Gas Recovery is a landfill gas-fueled power plant located in Broward County, Florida. The plant has a total capacity of 11.2 MW distributed across four generators. It began operating in 1989 and is owned by Waste Management, with WM Renewable Energy LLC listed as the operator per EIA data. The plant is interconnected to the Florida Power & Light Company balancing authority within the SERC NERC region.
In the most recent year of reported data, CSL Gas Recovery generated 50,438 MWh of electricity, achieving a capacity factor of 51.3%. The plant utilizes landfill gas as its primary fuel source. CSL Gas Recovery ranks as the largest of 12 landfill gas plants in Florida and 30th out of 284 such facilities nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
IPP Non-CHP
3.9K MWh
Latest Month
50.4K MWh
Annual Generation
51.3%
Capacity Factor
CO₂ Intensity
0 lb/MWh
NOx
0.000 lb/MWh
SO₂
0.761 lb/MWh
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
40.8%
Annual Net Gen
40 GWh
CO₂eq
0.004 lb/MWh
Subregion
FRCC All
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $39.1M
Market Position
LMP Node
FP&L
Pricing Hub
—
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about CSL Gas Recovery