Search plants, projects, owners, and states
1.6 MW Hydro operating in Wayne, MI
1.6 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1988
Operating Since
Coordinates
42.2143, -83.4407
County
Wayne, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | — | — |
| Owner(s) | STS Hydropower, LLC | — | — |
| Status | Operating | — | — |
The French Landing Dam and Powerhouse is a hydroelectric gravity dam and powerhouse crossing the Huron River in Van Buren Charter Township in Wayne County in the U.S. state of Michigan. The dam and the powerhouse were completed in 1925 by the Detroit Edison Company on land previously purchased in 1910. The dam and powerhouse were designated as a Michigan State Historic Site on February 18, 1982.
Read more on WikipediaFrench Landing Dam is a hydroelectric power plant located in Wayne County, Michigan. The plant has a total capacity of 1.6 MW and began operating in 1988. It is owned and operated by Eagle Creek Renewable Energy, LLC. The plant utilizes a single generator and conventional hydroelectric technology, with water (WAT) as its primary fuel source.
The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. In terms of size, French Landing Dam ranks 42nd out of 50 power plants in Michigan and 1299th out of 1464 nationally. The latest annual generation data indicates an output of 8,470 MWh, resulting in a capacity factor of 60.3%.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
40.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
386 MWh
Latest Month
8.5K MWh
Annual Generation
60.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
French Landing Substation · 40 kV
Substation Distance
< 10 km
Operator
DTE Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about French Landing DamForward forecasts, scenario decomposition, and risk-decision tooling for this asset.