31 MW Wind operating in Riverside, CA
31 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
1983
Operating Since
Coordinates
33.9261, -116.6209
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | San Gorgonio Farms Inc | Terra-Gen; AES | — |
| Owner(s) | San Gorgonio Farms Inc | San Gorgonio Farms Inc | — |
| Status | Operating | operating | — |
GEM identifies the owner as San Gorgonio Farms Inc
This entity is not yet in the GEM ownership database — chain unavailable.
San Gorgonio Farms Wind Farm is a 31 MW wind power plant located in Riverside County, California. The plant began operating in 1983 and is owned and operated by San Gorgonio Farms Inc. It utilizes a single onshore wind turbine generator. The facility is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The wind farm's turbine has a hub height of 24 meters and a rotor diameter of 19.4 meters. The turbine was manufactured by Bonus and is model 120. In the most recent year of data, the plant generated 61,311 MWh of electricity, achieving a capacity factor of 22.5%. San Gorgonio Farms Wind Farm is ranked 62nd out of 116 wind plants in California and 1004th out of 1424 wind plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.0K MWh
Latest Month
61.3K MWh
Annual Generation
22.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $58.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
SANWD_1_QF
Pricing Hub
TH_SP15_GEN-APND
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14