5 MW Wood Waste operating in Harrison, TX
5 MW
Nameplate Capacity
1
Generators
unit
Wood/Wood Waste Biomass
Technology
1983
Operating Since
Coordinates
32.5747, -94.3739
County
Harrison, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Snider Industries Inc | — | — |
| Owner(s) | Snider Industries Inc | — | — |
| Status | Operating | — | — |
Snider Industries is a 5 MW biomass power plant located in Harrison County, Texas. The plant began operating in 1983 and utilizes wood and wood waste as its primary fuel source. It consists of a single generator and is owned and operated by Snider Industries Inc. The plant's balancing authority is the Southwest Power Pool (SPP), placing it within the Midcontinent Reliability Organization (MRO) NERC region.
In the most recent year with available data, Snider Industries generated 12,460 MWh of electricity, achieving a capacity factor of 28.4%. Among biomass plants in Texas, Snider Industries ranks 3rd out of 3 facilities. Nationally, it holds a rank of 92 out of 97 biomass power plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.2K MWh
Latest Month
12.5K MWh
Annual Generation
28.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
NOx
1 lb/MWh
SO₂
0.162 lb/MWh
CH₄
0.457 lb/MWh
N₂O
0.060 lb/MWh
Capacity Factor
26.1%
Annual Net Gen
11 GWh
CO₂eq
29 lb/MWh
Subregion
SPP South
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $17.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
North Marshall Substation · 69 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPPSOUTH_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Snider IndustriesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.