Search plants, projects, owners, and states
1.7 MW Hydro operating in Franklin, NY
1.7 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1988
Operating Since
Coordinates
44.9099, -74.0858
County
Franklin, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hydroland Omega LLC | — | — |
| Owner(s) | Hydroland Omega LLC | — | — |
| Status | Operating | — | — |
Chateaugay High Falls Hydro is a hydroelectric power plant located in Franklin County, New York. The plant has a total capacity of 1.7 MW and utilizes a single generator. It commenced operations in 1988 and is owned and operated by Hydroland Omega LLC. The primary fuel source for the plant is water (WAT), and its technology is classified as conventional hydroelectric.
In the most recent year with available data, Chateaugay High Falls Hydro generated 2,757 MWh of electricity, resulting in a capacity factor of 18.5%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Chateaugay High Falls Hydro ranks 141st out of 165 power plants in New York and 1270th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
181 MWh
Latest Month
2.8K MWh
Annual Generation
18.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
CHAT_HIGH_FALL_HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NORTH
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Chateaugay High Falls HydroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.