84.2 MW Natural Gas Fired Combustion Turbine (39 MW) + Wood/Wood Waste Biomass (45 MW) operating in Ouachita, LA
84.2 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Wood/Wood Waste Biomass
1964
Operating Since
Coordinates
36.6801, -76.9119
County
Ouachita, LA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Graphic Packaging International | Graphic Packaging International LLC | — |
| Owner(s) | Graphic Packaging International | Graphic Packaging Holding | — |
| Status | Operating | operating | — |
Plant 31 Paper Mill, located in Ouachita County, Louisiana, is an 84.2 MW hybrid power plant primarily fueled by black liquor (BLQ). The facility, which began operating in 1964, consists of three generators utilizing both natural gas fired combustion turbine and wood/wood waste biomass technologies. It is owned by Graphic Packaging Holding and operated by Graphic Packaging International.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In the most recent year of data, Plant 31 Paper Mill generated 522,982 MWh of electricity, achieving a capacity factor of 70.7%. Among similar facilities in Louisiana, it ranks 3rd out of 7, and nationally it ranks 21st out of 66.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Industrial CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
46.9K MWh
Latest Month
523.0K MWh
Annual Generation
70.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
322 lb/MWh
NOx
0.715 lb/MWh
SO₂
2 lb/MWh
CH₄
0.129 lb/MWh
N₂O
0.027 lb/MWh
Capacity Factor
66.6%
Annual Net Gen
491 GWh
CO₂eq
332 lb/MWh
Subregion
SERC Mississippi Valley
2013
$3,495/kW
Est. Construction Cost
Total estimated cost: $294.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
LOUISIANA.HUB
Alt. Hub / Zone
MS.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Plant 31 Paper MillForward forecasts, scenario decomposition, and risk-decision tooling for this asset.