Search plants, projects, owners, and states
Retired in December 2025, according to EIA. Last listed as operating or planned in January 2026. EIA-860M · Sep 2026
25 MW Natural Gas in El Paso, CO
25 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Steam Turbine
Technology
1957
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
38.8814, -104.8169
County
El Paso, CO
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Colorado Springs - (CO) | — | — |
| Owner(s) | City of Colorado Springs - (CO) | — | — |
| Status | Retired | — | — |
The George Birdsall plant is a natural gas-fired power plant located in El Paso County, Colorado. It has a total capacity of 61.1 MW distributed across three generators utilizing natural gas steam turbine technology. The plant began operating in 1953 and is owned and operated by the City of Colorado Springs.
In the most recent year of reported data, the George Birdsall plant generated 21,298 MWh of electricity, achieving a capacity factor of 3.9%. The plant operates within the Western Area Power Administration - Rocky Mountain Region balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 25th largest power plant in Colorado out of 32, and nationally it is ranked 1053 out of 1963 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Western Area Power Administration - Rocky Mountain Region (WACM)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
21.3K MWh
Annual Generation
9.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1650 lb/MWh
NOx
2 lb/MWh
SO₂
0.008 lb/MWh
CH₄
0.031 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
5.8%
Annual Net Gen
31 GWh
CO₂eq
1652 lb/MWh
Subregion
WECC Rockies
2013
$965/kW
Est. Construction Cost
Total estimated cost: $24.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about George BirdsallForward forecasts, scenario decomposition, and risk-decision tooling for this asset.