Search plants, projects, owners, and states
3.1 MW Hydro operating in Orange, CA
3.1 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1984
Operating Since
Coordinates
33.9249, -117.9552
County
Orange, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Metropolitan Water District of S CA | — | — |
| Owner(s) | Metropolitan Water District of S CA | — | — |
| Status | Operating | — | — |
Coyote Creek is a 3.1 MW hydroelectric power plant located in Orange County, California. The plant began operating in 1984 and has one generator. It is owned and operated by the Metropolitan Water District of Southern California. The plant's primary fuel source is water (WAT), and it utilizes conventional hydroelectric technology.
Coyote Creek operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant's ranking in terms of size is 193 out of 247 power plants in California, and 1055 out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
66.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $7.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Coyote Creek
Substation Distance
0.003 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
OLINDA_6_N008
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Coyote CreekForward forecasts, scenario decomposition, and risk-decision tooling for this asset.