Search plants, projects, owners, and states
25.5 MW Hydro operating in El Dorado, CA
25.5 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1965
Operating Since
Coordinates
38.8966, -120.3783
County
El Dorado, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Sacramento Municipal Util Dist | — | — |
| Owner(s) | Sacramento Municipal Util Dist | — | — |
| Status | Operating | — | — |
Robbs Peak is a 25.5 MW conventional hydroelectric power plant located in El Dorado County, California. The plant began operating in 1965 and has one generator. It is owned and operated by Sacramento Municipal Utility District (SMUD). Robbs Peak is within the Balancing Authority of Northern California balancing authority area and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Robbs Peak generated 35,734 MWh of electricity, achieving a capacity factor of 16.0%. The plant is ranked as the 86th largest in California out of 247 plants, and nationally it is ranked 442nd out of 1464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
California (non-ISO)
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Balancing Authority of Northern California (BANC)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
35.7K MWh
Annual Generation
16.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $58.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Robbs PeakForward forecasts, scenario decomposition, and risk-decision tooling for this asset.