6.4 MW Hydro operating in Platte, WY
6.4 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1927
Operating Since
Coordinates
42.2899, -104.7606
County
Platte, WY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | U S Bureau of Reclamation | — | United States Bureau of Reclamation |
| Owner(s) | U S Bureau of Reclamation | — | United States Bureau of Reclamation |
| Status | Operating | — | — |
Guernsey Dam is an earthfill dam on the North Platte River in Platte County in the U.S. State of Wyoming. The dam creates Guernsey Reservoir, the last of the 5 major reservoirs on the North Platte River in Wyoming. The dam contains a hydroelectric plant capable of producing 6.4 megawatts of electricity. The total capacity of the reservoir is 71,040 acre-feet (87,630,000 m3) of water which is used mainly for irrigation. Morrison-Knudsen and Utah Construction Company constructed Guernsey Dam and the hydroelectric plant as part of the North Platte Project to provide irrigation to eastern Wyoming and western Nebraska. Guernsey helps control the river flow and stores water released from the project's primary storage upstream at Pathfinder Reservoir. About 8 miles (13 km) downstream of the dam, the Whalen Diversion Dam diverts water into the Fort Laramie and Interstate Canals that service farms in Wyoming and Nebraska.
Read more on WikipediaThe Guernsey Hydroelectric Power Plant, located in Platte County, Wyoming, has a total capacity of 6.4 MW. The plant began operating in 1927 and is owned and operated by the U.S. Bureau of Reclamation. It utilizes conventional hydroelectric technology with water as its primary fuel source, distributed across two generators. Guernsey is ranked as the 9th largest power plant in Wyoming out of 16, and 800th nationally out of 1464 plants.
Guernsey operates within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of the Western Area Power Administration UGP West. The plant's latest annual generation was 18,365 MWh, achieving a capacity factor of 32.6%.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Western Area Power Administration UGP West (WAUW)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
18.4K MWh
Annual Generation
32.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $14.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about GuernseyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.