4.2 MW Hydro operating in Lincoln, WI
4.2 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1925
Operating Since
Coordinates
45.1875, -89.7553
County
Lincoln, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wisconsin Public Service Corp | Wisconsin Public Service | — |
| Owner(s) | Wisconsin Public Service Corp | WEC Energy Group | — |
| Status | Operating | — | — |
The Alexander hydroelectric plant, located in Lincoln County, Wisconsin, has a total capacity of 4.2 MW. The plant began operating in 1925 and consists of three generators utilizing conventional hydroelectric technology. It is owned by WEC Energy Group and operated by Wisconsin Public Service Corp. The primary fuel source for the Alexander plant is water (WAT).
In the most recent year with available data, the plant generated 18,961 MWh, achieving a capacity factor of 51.4%. The Alexander plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the ReliabilityFirst Corporation (RFC) NERC region. The plant's installed cost was $652.28 per kW, according to FERC data. Alexander ranks 36th out of 65 power plants in Wisconsin and 949th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
46.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
1.6K MWh
Latest Month
19.0K MWh
Annual Generation
51.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Hydroelectric · Wisconsin Public Service Corporation · Data from 2016–2024
$811/kW
Installed Cost
$25.1/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
WPS.WPSM
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Location Type
Load Zone
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about AlexanderForward forecasts, scenario decomposition, and risk-decision tooling for this asset.