1.2 MW Hydro operating in Washburn, WI
1.2 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1927
Operating Since
Coordinates
45.9479, -91.8884
County
Washburn, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Northern States Power Co - Minnesota | — | — |
| Owner(s) | Northern States Power Co - Minnesota | — | — |
| Status | Operating | — | — |
The Trego hydroelectric plant is located in Washburn County, Wisconsin. The plant has a total capacity of 1.2 MW and is operated by Northern States Power Co - Minnesota. Commissioned in 1927, the facility utilizes conventional hydroelectric technology and consists of two generators, using water (WAT) as its primary fuel source. Trego operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region.
In the latest reporting year, Trego generated 6,535 MWh of electricity, achieving a capacity factor of 62.0%. The plant's installed cost was $1,497.97 per kW, according to FERC data. Trego is ranked as the 59th largest power plant in Wisconsin out of 65, and nationally it is ranked 1388 out of 1464.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
23.9 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
378 MWh
Latest Month
6.5K MWh
Annual Generation
62.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Hydroelectric · Northern States Power Company (Wisconsin) · Data from 2015–2024
$1,868/kW
Installed Cost
$79.9/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Node Source
Plant coordinates only
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.