Search plants, projects, owners, and states
57.6 MW Natural Gas operating in Dane, WI
57.6 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1973
Operating Since
Coordinates
43.0149, -89.4606
County
Dane, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Madison Gas & Electric Co | Madison Gas & Electric | — |
| Owner(s) | Madison Gas & Electric Co | MGE Energy | — |
| Status | Operating | — | — |
The Fitchburg power plant, located in Dane County, Wisconsin, has a total capacity of 57.6 MW. The plant began operating in 1973 and utilizes two natural gas-fired combustion turbine generators. It is owned by MGE Energy and operated by Madison Gas & Electric Co. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
Fitchburg's latest annual generation was 14 MWh, resulting in a capacity factor of 0.0%. The plant is ranked 27th out of 35 power plants in Wisconsin and 1074th out of 1963 nationally. Financial data indicates an installed cost of $82.21 per kW, according to FERC data. The plant is within the NERC region of MRO.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1 MWh
Latest Month
14 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
0 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
268 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.577 lb/MWh
N₂O
0.058 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
31 lb/MWh
Subregion
MRO East
Gas turbine · Madison Gas and Electric Company · Data from 2015–2024
$133/kW
Installed Cost
$9/kW
Annual CapEx
$28872.1/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Fitchburg Substation · 138 kV
Substation Distance
< 10 km
Operator
MG&E
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
ILLINOIS.HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FitchburgForward forecasts, scenario decomposition, and risk-decision tooling for this asset.