Search plants, projects, owners, and states
1.8 MW Hydro operating in Stevens, WA
1.8 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1915
Operating Since
Coordinates
48.5953, -118.0603
County
Stevens, WA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hydro Technology Systems Inc | — | — |
| Owner(s) | Hydro Technology Systems Inc | — | — |
| Status | Operating | — | — |
Meyers Falls is a hydroelectric power plant located in Stevens County, Washington. The plant has a total capacity of 1.6 MW across four generators and primarily uses water as its fuel source. It began operating in 1915 and is currently owned and operated by Hydro Technology Systems Inc. Meyers Falls is within the Western Electricity Coordinating Council (WECC) NERC region, and its balancing authority is Avista Corporation.
In the most recent year with available data, Meyers Falls generated 9,201 MWh of electricity, achieving a capacity factor of 65.6%. The plant is ranked 68th out of 75 power plants in Washington and 1301st out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Avista Corporation (AVA)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
836 MWh
Latest Month
9.2K MWh
Annual Generation
65.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $4.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Meyers FallsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.