Search plants, projects, owners, and states
11.8 MW Hydro operating in Patrick, VA
11.8 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1938
Operating Since
Coordinates
36.6669, -80.4479
County
Patrick, VA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Northbrook Virginia Hydro, LLC | — | — |
| Owner(s) | Northbrook Energy LLC | — | — |
| Status | Operating | — | — |
Pinnacles is a hydroelectric power plant located in Patrick County, Virginia. The plant, which began operating in 1938, has a total capacity of 11.8 MW distributed across 4 generators. It is owned and operated by Northbrook Virginia Hydro, LLC, and utilizes water as its primary fuel source with conventional hydroelectric technology. Pinnacles is connected to the PJM Interconnection, LLC balancing authority and resides within the RFC NERC region.
In the most recent year of reported data, Pinnacles generated 35,146 MWh of electricity, achieving a capacity factor of 33.9%. The plant is ranked as the 9th largest out of 25 hydroelectric facilities in Virginia, and it holds the 625th position nationally among 1464 similar plants. Recent news coverage related to Pinnacles includes 4 articles on industry topics, 2 on regulatory matters, and one each covering hazards, grid issues, and deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.8K MWh
Latest Month
35.1K MWh
Annual Generation
33.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $27.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about PinnaclesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.