Search plants, projects, owners, and states
1.8 MW Hydro operating in Lamoille, VT
1.8 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1924
Operating Since
Coordinates
44.5618, -72.6024
County
Lamoille, VT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Village of Morrisville - (VT) | — | — |
| Owner(s) | Village of Morrisville - (VT) | — | — |
| Status | Operating | — | — |
The Morrisville plant, located in Lamoille County, Vermont, is a conventional hydroelectric facility with a total capacity of 1.8 MW. It began operating in 1924 and consists of two generators. The primary fuel source is water (WAT). The plant is owned and operated by the Village of Morrisville - (VT).
Morrisville's latest annual generation was 4,919 MWh, resulting in a capacity factor of 31.1%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the Morrisville plant is ranked 36th out of 46 power plants in Vermont, and 1260th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
482 MWh
Latest Month
4.9K MWh
Annual Generation
31.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $4.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
4466
Pricing Hub
.Z.VERMONT
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-04-06
View all articlesNo Ask reports yet for this entity.