623 MW Natural Gas operating in Bastrop, TX
623 MW
Nameplate Capacity
3
Generators
units
Natural Gas Steam Turbine
Technology
1965
Operating Since
Coordinates
30.1456, -97.2708
County
Bastrop, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Lower Colorado River Authority | Lower Colorado River Authority | — |
| Owner(s) | Lower Colorado River Authority | Lower Colorado River Authority | — |
| Status | Operating | — | — |
The Sim Gideon Power Plant is a 639 megawatt (MW), natural gas fired power plant located near Bastrop, Texas in Bastrop County, Texas. It is owned and operated by the Lower Colorado River Authority. The Sim Gideon Power Plant consists of three generating units that operate via natural gas-fired boilers. The plant, along with Lost Pines Power Project 1, is part of the Lost Pines Power Park.
Read more on WikipediaThe Sim Gideon Power Plant is a 623 MW natural gas-fired power plant located in Bastrop County, Texas. The plant began operating in 1965 and consists of three natural gas steam turbine generators. It is owned and operated by the Lower Colorado River Authority (LCRA). The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is within the Texas Reliability Entity (TRE) NERC region.
In the most recent year with available data, Sim Gideon generated 1,043,148 MWh of electricity, achieving a capacity factor of 19.0%. Sim Gideon is ranked as the 57th largest power plant in Texas out of 144, and 377th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
31.1K MWh
Latest Month
1.0M MWh
Annual Generation
19.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1295 lb/MWh
NOx
2 lb/MWh
SO₂
0.007 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
21.9%
Annual Net Gen
1196 GWh
CO₂eq
1297 lb/MWh
Subregion
ERCOT All
2013
$965/kW
Est. Construction Cost
Total estimated cost: $601.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Sim Gideon Station · 138 kV
Substation Distance
0 km
Operator
Lower Colorado River Authority
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
GID_GIDEONG1
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.