Search plants, projects, owners, and states
103.7 MW Hydro operating in Sumner, TN
103.7 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1957
Operating Since
Coordinates
36.2972, -86.6556
County
Sumner, TN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USCE-Nashville District | US Army Corps of Engineers - Nashville District | — |
| Owner(s) | USCE-Nashville District | US Army Corps of Engineers - Nashville District | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Army Corps of Engineers - Nashville District
This entity is not yet in the GEM ownership database — chain unavailable.
Old Hickory Lock and Dam is a dam located in middle Tennessee on the Cumberland River at river mile 216.2 in Sumner and Davidson Counties, approximately 25 miles (40 km) upstream from Nashville. The reservoir behind the dam is Old Hickory Lake. The dam and lake are named after President Andrew Jackson, who lived in the vicinity at The Hermitage.
Read more on WikipediaOld Hickory is a hydroelectric power plant located in Sumner County, Tennessee. The plant has a total capacity of 103.7 MW across four generators and is operated by the US Army Corps of Engineers (USCE) Nashville District. It began operating in 1957, utilizing conventional hydroelectric technology and water as its primary fuel source. The plant's balancing authority is the Tennessee Valley Authority (TVA), and it falls within the SERC NERC region.
In the most recent year with available data, Old Hickory generated 436,555 MWh of electricity, achieving a capacity factor of 48.0%. The plant is ranked as the 13th largest in Tennessee out of 13 plants and 182nd nationally out of 194 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
31.5K MWh
Latest Month
436.6K MWh
Annual Generation
48.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $237.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Old HickoryForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
New Generator Step-up Unit Transformers delivered to Old Hickory Power Plant as capital infrastructure upgrade
sourceRecovery underway after December 2023 tornado damaged Old Hickory Dam area, disrupting communications and surrounding infrastructure
source