54 MW Hydro operating in Clay, TN
54 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1948
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USCE-Nashville District | US Army Corps of Engineers - Nashville District | — |
| Owner(s) | USCE-Nashville District | US Army Corps of Engineers - Nashville District | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Army Corps of Engineers - Nashville District
This entity is not yet in the GEM ownership database — chain unavailable.
The Dale Hollow hydroelectric plant is located in Clay County, Tennessee. The plant has a total capacity of 54 MW across three generators, and it began operating in 1948. The primary fuel source is water (WAT), and the plant utilizes conventional hydroelectric technology. The owner and operator is the US Army Corps of Engineers, Nashville District (USCE-Nashville District).
Dale Hollow's latest annual generation was 105,949 MWh, resulting in a capacity factor of 22.3%. The plant is within the balancing authority of the Tennessee Valley Authority (TVA) and the NERC region of SERC. Dale Hollow ranks 19th out of 29 power plants in Tennessee and 289th out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
4.9K MWh
Latest Month
105.9K MWh
Annual Generation
22.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $123.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Dale HollowForward forecasts, scenario decomposition, and risk-decision tooling for this asset.