150.8 MW Hydro operating in Sevier, TN
150.8 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1943
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
35.9616, -83.5389
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Sevier, TN
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
2 mapped line sections connect the two facilities over 13.299 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Owner(s) | Tennessee Valley Authority | Tennessee Valley Authority | — |
| Status | Operating | operating | — |
Douglas Dam is a hydroelectric dam on the French Broad River in Sevier County, Tennessee, in the southeastern United States. The dam is operated by the Tennessee Valley Authority (TVA), which built the dam in record time in the early 1940s to meet emergency energy demands at the height of World War II. Douglas Dam is a straight reinforced concrete gravity-type dam 1705 feet long and 202 feet high, impounding the 28,420-acre (11,500 ha) Douglas Lake. The dam was named for Douglas Bluff, a cliff overlooking the dam site prior to construction.
Read more on WikipediaSummary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Douglas Dam is a hydroelectric power plant located in Sevier County, Tennessee. The plant is owned and operated by the Tennessee Valley Authority (TVA). Commissioned in 1943, it has a total capacity of 150.8 MW derived from four generators utilizing conventional hydroelectric technology. The primary fuel source is water (WAT). Douglas Dam operates within the Tennessee Valley Authority balancing authority and the SERC NERC region.
In the most recent year with available data, Douglas Dam generated 446,397 MWh of electricity, achieving a capacity factor of 33.7%. The plant is ranked as the 7th largest hydroelectric facility out of 13 in Tennessee, and 132nd out of 194 nationally.
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tennessee Valley Authority (TVA)
Grid Voltage
161.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
28.1K MWh
Latest Month
446.4K MWh
Annual Generation
33.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $346.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 8 articlesTop operators in Tennessee
Data tables and metrics from the InfraSure database.
SPC Bloom BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Hydro Plant
Data tables and metrics from the InfraSure database.
Coke BESS
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.