Search plants, projects, owners, and states
3.9 MW Conventional Hydroelectric (3 MW) + Petroleum Liquids (1 MW) operating in Anderson, SC
3.9 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Conventional Hydroelectric + Petroleum Liquids
1941
Operating Since
Coordinates
34.2571, -82.6099
County
Anderson, SC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Abbeville - (SC) | — | — |
| Owner(s) | City of Abbeville - (SC) | — | — |
| Status | Operating | — | — |
Rocky River is a hybrid power plant located in Anderson County, South Carolina. The plant, which began operating in 1941, has a total capacity of 3.9 MW across three generators. The primary fuel source is water (WAT), utilizing conventional hydroelectric technology, but it also uses petroleum liquids. The plant is owned and operated by City of Abbeville - (SC).
Rocky River operates within the Duke Energy Carolinas balancing authority and the SERC NERC region. In terms of size, it is ranked 24th out of 33 power plants in South Carolina, and 981st out of 1464 nationally. The plant's latest annual generation was 6,059 MWh, resulting in a capacity factor of 17.7%.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
44.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
517 MWh
Latest Month
6.1K MWh
Annual Generation
17.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
—
NOx
—
SO₂
—
CH₄
0.000 lb/MWh
N₂O
0.000 lb/MWh
Capacity Factor
16.4%
Annual Net Gen
6 GWh
CO₂eq
0.000 lb/MWh
Subregion
SERC Virginia/Carolina
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $8.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Rocky River (SC)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.