32 MW Hydro operating in Douglas, OR
32 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1955
Operating Since
Coordinates
43.3558, -122.2494
County
Douglas, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | PacifiCorp | PacifiCorp | — |
| Owner(s) | PacifiCorp | Berkshire Hathaway | — |
| Status | Operating | — | — |
Located in Douglas County, Oregon, the Lemolo 1 hydroelectric plant has a total capacity of 32 MW. The plant began operating in 1955 and utilizes conventional hydroelectric technology. It is owned by Berkshire Hathaway and operated by PacifiCorp. The plant is the 19th largest in Oregon out of 63 plants, and ranks 397th nationally out of 1464 plants.
Lemolo 1's latest annual generation was 105,242 MWh, resulting in a capacity factor of 37.6%. The plant operates within the PacifiCorp - West balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data indicates an installed cost of $816.76 per kW and a power purchase agreement (PPA) price of $10.78 per MWh. The plant's primary fuel source is water (WAT). It consists of a single generator.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
PacifiCorp - West (PACW)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
7.8K MWh
Latest Month
105.2K MWh
Annual Generation
37.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
PacifiCorp · Data from 2015–2025
$10.8/MWh
PPA Price
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lemolo 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.