18.5 MW Natural Gas Internal Combustion Engine (17 MW) + Petroleum Liquids (1 MW) operating in Lorain, OH
18.5 MW
Nameplate Capacity
9
Generators
units
Hybrid (2)
Technology
Natural Gas Internal Combustion Engine + Petroleum Liquids
1948
Operating Since
Coordinates
41.2840, -82.2192
County
Lorain, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Oberlin - (OH) | — | — |
| Owner(s) | City of Oberlin - (OH) | — | — |
| Status | Operating | — | — |
The Oberlin power plant, located in Lorain County, Ohio, has a total capacity of 18.5 MW. The plant began operating in 1948 and is owned and operated by the City of Oberlin. It utilizes both natural gas and petroleum liquids as primary fuels, employing natural gas internal combustion engine technology. The facility consists of 9 generators and is considered a hybrid plant.
In the most recent year with available data, the Oberlin plant generated 634 MWh of electricity, resulting in a capacity factor of 0.4%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, the Oberlin plant ranks 36th out of 46 power plants in Ohio and 1331st out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
63 MWh
Latest Month
634 MWh
Annual Generation
0.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
3049 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
68 lb/MWh
SO₂
0.516 lb/MWh
CH₄
0.074 lb/MWh
N₂O
0.010 lb/MWh
Capacity Factor
0.2%
Annual Net Gen
0 GWh
CO₂eq
3054 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $14.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
OBERLIN 69 KV LD1
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Oberlin (OH)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.