Search plants, projects, owners, and states
49.6 MW Conventional Steam Coal (28 MW) + Natural Gas Fired Combustion Turbine (20 MW) + Petroleum Liquids (3 MW) operating in Tuscarawas, OH
49.6 MW
Nameplate Capacity
4
Generators
units
Hybrid (3)
Technology
Conventional Steam Coal + Natural Gas Fired Combustion Turbine + Petroleum Liquids
1954
Operating Since
Coordinates
40.5201, -81.4681
County
Tuscarawas, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Dover - (OH) | — | — |
| Owner(s) | City of Dover - (OH) | — | — |
| Status | Operating | — | — |
Located in Tuscarawas County, Ohio, the Dover power plant has a total capacity of 49.6 MW. The plant, identified by plant ID 2914, commenced operations in 1954 and is operated by the City of Dover. The primary fuel source is bituminous coal (BIT), but the plant also utilizes natural gas and petroleum liquids. The facility is considered a hybrid plant due to its multiple fuel sources and technologies, which include conventional steam coal and combustion turbines. It has four generators.
The Dover plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, it ranks 6th out of 6 power plants in Ohio and 56th out of 60 nationally. The latest annual generation data indicates an output of 51,692 MWh, resulting in a capacity factor of 11.9%.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
5.7K MWh
Latest Month
51.7K MWh
Annual Generation
11.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
No financial data available for this plant.
This is a small open-data project — if you have sources or want more coverage here, drop a note.
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
DOVER 69 KV CDOVER
Pricing Hub
AEP-DAYTON HUB
Alt. Hub / Zone
WESTERN HUB
Node Source
Curated node match
Last updated 2026-03-15
View all 7 articlesNo Ask reports yet for this entity.
Ask about Dover (OH)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.