450 MW Natural Gas Fired Combustion Turbine (435 MW) + Petroleum Liquids (15 MW) operating in Defiance, OH
450 MW
Nameplate Capacity
6
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Petroleum Liquids
1965
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
41.3051, -84.3348
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Defiance, OH
Nearby Plants
The line is mapped. The plant’s electrical connection and official point of interconnection still need confirmation.
2 mapped line sections connect the two facilities over 32.867 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Richland-Stryker Generation LLC | Richland-Stryker Generation | — |
| Owner(s) | Richland-Stryker Generation LLC | Vistra | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Richland power plant, located in Defiance County, Ohio, has a total capacity of 450 MW. The plant began operating in 1965 and is owned by Vistra, with Richland-Stryker Generation LLC as the listed operator per the EIA. The facility primarily burns natural gas, utilizing natural gas-fired combustion turbine technology, but also has the capability to use petroleum liquids. With six generators, the plant is considered a hybrid facility.
In the most recent year of reported data, Richland generated 327,320 MWh of electricity, resulting in a capacity factor of 8.3%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Richland is ranked as the 22nd largest power plant out of 25 in Ohio, and 516th out of 945 nationally. Recent news coverage of the plant has focused on hazards.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10.4K MWh
Latest Month
327.3K MWh
Annual Generation
8.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1603 lb/MWh
NOx
1 lb/MWh
SO₂
0.008 lb/MWh
CH₄
0.031 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
5.9%
Annual Net Gen
231 GWh
CO₂eq
1605 lb/MWh
Subregion
RFC West
2013
$765/kW
Est. Construction Cost
Total estimated cost: $344.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
RICHLND 13.8 KV RP85
Pricing Hub
AEP-DAYTON HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all articlesRichland in Ohio growth signals — PPAs, construction, new projects
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Richland (OH)
Data-driven briefing on Richland — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.