Search plants, projects, owners, and states
52.2 MW Hydro operating in Amador, CA
52.2 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1931
Operating Since
Coordinates
38.4493, -120.4926
County
Amador, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pacific Gas & Electric Co. | Pacific Gas and Electric | — |
| Owner(s) | Pacific Gas & Electric Co. | PG&E | — |
| Status | Operating | operating | — |
Tiger Creek is a 52.2 MW hydroelectric power plant located in Amador County, California. The plant, which began operating in 1931, utilizes conventional hydroelectric technology and consists of two generators. It is owned and operated by Pacific Gas & Electric Co. (PG&E). The plant's primary fuel source is water (WAT).
In the most recent year with available data, Tiger Creek generated 225,092 MWh of electricity, achieving a capacity factor of 49.0%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Tiger Creek ranks 63rd out of 247 power plants in California and 295th out of 1464 plants nationally. Financial data indicates an installed cost of $2923.03 per kW.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
22.5K MWh
Latest Month
225.1K MWh
Annual Generation
49.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Hydro with storage · PACIFIC GAS AND ELECTRIC COMPANY · Data from 2015–2024
$3,004/kW
Installed Cost
$29.8/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Tiger Creek
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
TIGRCK_7_UNITS-APND
Pricing Hub
TH_NP15_GEN-APND
Location Type
Aggregated Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Tiger CreekForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
FERC issued Notice of Authorization for Continued Project Operation for Tiger Creek while the parallel decommissioning proceeding is underway.
sourceFERC published scoping notice for PG&E's proposed surrender and decommissioning of the Tiger Creek hydroelectric project, including non-project use of project lands.
source