13.5 MW Distillate Oil operating in Montgomery, OH
13.5 MW
Nameplate Capacity
5
Generators
units
Petroleum Liquids
Technology
1968
Operating Since
Coordinates
39.7677, -84.1711
County
Montgomery, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kimura Power LLC | Kimura Power | — |
| Owner(s) | Kimura Power LLC | Rockland Capital | — |
| Status | Operating | — | — |
The Monument power plant is a 13.5 MW electricity generating facility located in Montgomery County, Ohio. The plant, which began operating in 1968, consists of 5 generators utilizing petroleum liquids as its primary fuel source. It is owned by Rockland Capital and operated by Kimura Power LLC. Monument operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region.
In the most recent year for which data is available, the plant generated 114 MWh of electricity, achieving a capacity factor of 0.1%. According to available data, the installed cost per kilowatt was $90.35. Monument ranks 9th out of 38 similar plants in the state of Ohio and 267th out of 886 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.4 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
14 MWh
Latest Month
114 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1884 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
37 lb/MWh
SO₂
3 lb/MWh
CH₄
0.076 lb/MWh
N₂O
0.015 lb/MWh
Capacity Factor
0.0%
Annual Net Gen
0 GWh
CO₂eq
1890 lb/MWh
Subregion
RFC West
Internal combustion · The Dayton Power and Light Company · Data from 2015–2017
$0/kW
Installed Cost
$-153/kW
Annual CapEx
$264.0/MWh
Operating Cost
Annual Capital & Operating Expenses
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
DP&L Monument Substation
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
32418667
Pricing Hub
AEP-DAYTON HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about MonumentForward forecasts, scenario decomposition, and risk-decision tooling for this asset.