583.4 MW Hydro operating in Mercer, ND
583.4 MW
Nameplate Capacity
5
Generators
units
Conventional Hydroelectric
Technology
1956
Operating Since
Coordinates
47.4945, -101.4115
County
Mercer, ND
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USACE-Omaha | US Army Corps of Engineers - Omaha District | — |
| Owner(s) | USACE-Omaha | US Army Corps of Engineers - Omaha District | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Army Corps of Engineers - Omaha District
This entity is not yet in the GEM ownership database — chain unavailable.

Garrison Dam is an earth-fill embankment dam on the Missouri River in central North Dakota, U.S. Constructed by the U.S. Army Corps of Engineers from 1947 to 1953, at over two miles (3.2 km) in length, the dam is the fifth-largest earthen dam in the world. The reservoir impounded by the dam is Lake Sakakawea, which extends to Williston and the confluence with the Yellowstone River, near the Montana border. The dam and resulting reservoir inundated approximately one-sixth (16.6%) to one-fourth (25%) of Fort Berthold Indian Reservation's land, resulting in the loss of homes, farmland, and community infrastructure for the Three Affiliated Tribes.
Read more on WikipediaThe Garrison hydroelectric plant, located in Mercer County, North Dakota, has a total capacity of 583.4 MW across five generators. It commenced operations in 1956 and is owned and operated by USACE-Omaha. The plant utilizes water as its primary fuel source and employs conventional hydroelectric technology. Garrison is the largest hydroelectric plant in North Dakota and ranks 44th nationally among 194 hydroelectric facilities.
In the latest annual reporting period, the plant generated 2,060,635 MWh of electricity, achieving a capacity factor of 40.3%. The Garrison plant operates within the Southwest Power Pool (SPP) balancing authority and is situated in the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
148.9K MWh
Latest Month
2.1M MWh
Annual Generation
40.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $1.3B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.GARRISON.1_3
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about GarrisonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
US Senator Hoeven toured Garrison Dam with Army Corps of Engineers personnel to highlight planned coming modifications to the facility.