11.6 MW Hydro operating in Albany, NY
11.6 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1924
Operating Since
Coordinates
42.8056, -73.7226
County
Albany, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New York Power Authority | New York Power Authority | — |
| Owner(s) | New York Power Authority | New York Power Authority | — |
| Status | Operating | — | — |
The Crescent hydroelectric plant, located in Albany County, New York, has a total capacity of 11.6 MW. The plant began operating in 1924 and consists of 4 generators utilizing conventional hydroelectric technology. It is owned and operated by the New York Power Authority. Crescent uses water (WAT) as its primary fuel source.
The plant's latest annual generation was 55,802 MWh, resulting in a capacity factor of 54.8%. Crescent operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. The plant ranks 40th out of 165 power plants in New York state and 632nd out of 1464 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
6.8K MWh
Latest Month
55.8K MWh
Annual Generation
54.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $26.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
MOHAWK_PAPER___DRP
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone F
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26