10.8 MW Hydro operating in Sullivan, NY
10.8 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1927
Operating Since
Coordinates
41.4621, -74.7584
County
Sullivan, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eagle Creek Renewable Energy, LLC | — | — |
| Owner(s) | Eagle Creek Hydro Power, LLC | — | — |
| Status | Operating | — | — |
The Rio hydroelectric plant, located in Sullivan County, New York, has a total capacity of 10.8 MW. The plant began operating in 1927 and is owned and operated by Eagle Creek Renewable Energy, LLC. It utilizes conventional hydroelectric technology with water (WAT) as its primary fuel source, distributed across two generators. Rio is connected to the New York Independent System Operator (NYISO) balancing authority and falls within the North American Electric Reliability Corporation (NERC) NPCC region.
In the most recent year with available data, the plant generated 21,220 MWh, achieving a capacity factor of 22.5%. Rio ranks as the 42nd largest power plant in New York out of 165 facilities and is ranked 644th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
69.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
812 MWh
Latest Month
21.2K MWh
Annual Generation
22.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $24.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
MONGAUP___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
23641
Pricing Hub
HUD VL
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about RioForward forecasts, scenario decomposition, and risk-decision tooling for this asset.