Search plants, projects, owners, and states
16 MW Hydro operating in Lewis, NY
16 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1925
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Erie Boulevard Hydropower LP | — | — |
| Owner(s) | Erie Boulevard Hydropower LP | — | — |
| Status | Operating | — | — |
The Soft Maple hydroelectric plant is located in Lewis County, New York. It has a total capacity of 16 MW and is operated by Erie Boulevard Hydropower LP. The plant began operating in 1925 and consists of two generators utilizing conventional hydroelectric technology. Soft Maple's primary fuel source is water (WAT).
In the most recent year of reported data, the plant generated 38,381 MWh, achieving a capacity factor of 27.3%. Soft Maple operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Among hydroelectric plants in New York, Soft Maple ranks 28th out of 165, and nationally it ranks 536th out of 1464.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
4.2K MWh
Latest Month
38.4K MWh
Annual Generation
27.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $36.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
BEAVER RIVER___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
24048
Pricing Hub
NYISO Zone E
Node Source
EIA-860 direct report
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Soft MapleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.