Search plants, projects, owners, and states
1.3 MW Hydro operating in Oswego, NY
1.3 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1924
Operating Since
Coordinates
43.3241, -76.4190
County
Oswego, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Erie Boulevard Hydropower LP | — | — |
| Owner(s) | Erie Boulevard Hydropower LP | — | — |
| Status | Operating | — | — |
Fulton Hydro is a hydroelectric power plant located in Oswego County, New York. The plant has a total capacity of 1.3 MW and is operated by Erie Boulevard Hydropower LP. It began operating in 1924 and utilizes conventional hydroelectric technology. The plant consists of 2 generators powered by water (WAT) as its primary fuel source.
In the most recent year with available data, Fulton Hydro generated 5,599 MWh of electricity, achieving a capacity factor of 49.1%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Fulton Hydro ranks as the 154th largest power plant in New York out of 165 plants, and nationally it ranks 1358 out of 1464.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
506 MWh
Latest Month
5.6K MWh
Annual Generation
49.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $3.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
SENECA OSWGO___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
24041
Pricing Hub
NYISO Zone C
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Fulton HydroForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo