2 MW Hydro operating in Lewis, NY
2 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1916
Operating Since
Coordinates
43.9276, -75.2884
County
Lewis, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Erie Boulevard Hydropower LP | — | — |
| Owner(s) | Erie Boulevard Hydropower LP | — | — |
| Status | Operating | — | — |
The Elmer hydroelectric plant is located in Lewis County, New York. It is owned and operated by Erie Boulevard Hydropower LP. The plant began operating in 1916 and has a total capacity of 2 MW, distributed across two generators. Elmer utilizes conventional hydroelectric technology and its primary fuel source is water (WAT).
Elmer operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Elmer ranks 128th out of 165 power plants in New York state, and 1222nd out of 1464 plants nationally. The plant's latest annual generation was 9,721 MWh, resulting in a capacity factor of 55.3%.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
9.7K MWh
Annual Generation
55.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $4.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
BEAVER RIVER___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
24048
Pricing Hub
NYISO Zone E
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Elmer