27.3 MW Distillate Oil operating in Suffolk, NY
27.3 MW
Nameplate Capacity
4
Generators
units
Petroleum Liquids
Technology
1962
Operating Since
Coordinates
40.9617, -72.2102
County
Suffolk, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | National Grid Generation LLC | National Grid Generation | — |
| Owner(s) | National Grid Generation LLC | National Grid | — |
| Status | Operating | — | — |
The East Hampton power plant, located in Suffolk County, New York, has a total capacity of 27.3 MW. The plant began operating in 1962 and is owned by National Grid, a company based in the United Kingdom. National Grid Generation LLC is the listed operator. The facility consists of four generators utilizing petroleum liquids, specifically distillate fuel oil (DFO), as its primary fuel source.
East Hampton operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. The plant's latest annual generation was 11,518 MWh, resulting in a capacity factor of 4.8%. Among power plants in New York, East Hampton ranks 7th out of 66 in size. Nationally, it is ranked 146th out of 886 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
0 MWh
Latest Month
11.5K MWh
Annual Generation
4.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1957 lb/MWh
NOx
7 lb/MWh
SO₂
0.000 lb/MWh
CH₄
0.091 lb/MWh
N₂O
0.018 lb/MWh
Capacity Factor
5.1%
Annual Net Gen
12 GWh
CO₂eq
1964 lb/MWh
Subregion
NPCC Long Island
2013
$765/kW
Est. Construction Cost
Total estimated cost: $20.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
EAST HAMPTON___GT
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
23717
Pricing Hub
LONGIL
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about East HamptonForward forecasts, scenario decomposition, and risk-decision tooling for this asset.