877.5 MW Natural Gas operating in Richmond, NY
877.5 MW
Nameplate Capacity
2
Generators
units
Natural Gas Steam Turbine
Technology
1959
Operating Since
Coordinates
40.5916, -74.2000
County
Richmond, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arthur Kill Power, LLC | — | — |
| Owner(s) | Arthur Kill Power LLC | — | — |
| Status | Operating | — | — |
The Arthur Kill Generating Station is an 895.5 MW hybrid power plant located in Richmond County, New York. The plant, which began operating in 1959, is owned and operated by NRG Arthur Kill Operations Inc. It utilizes both natural gas-fired combustion turbine and natural gas steam turbine technologies. The plant consists of 3 generators and operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Arthur Kill Generating Station is a significant power producer in New York, ranking as the 9th largest out of 38 plants in the state and 209th largest out of 945 plants nationally. The plant's latest annual generation was 2,056,487 MWh, resulting in a capacity factor of 26.3%. The plant has been the subject of 10 news articles, covering topics such as industry trends, grid operations, hazards, regulatory matters, and business deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
191.7K MWh
Latest Month
2.1M MWh
Annual Generation
26.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1339 lb/MWh
NOx
0.786 lb/MWh
SO₂
0.007 lb/MWh
CH₄
0.025 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
13.3%
Annual Net Gen
1044 GWh
CO₂eq
1341 lb/MWh
Subregion
NPCC NYC/Westchester
2013
$965/kW
Est. Construction Cost
Total estimated cost: $864.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
ARTHUR_KILL_2
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
N.Y.C.
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Arthur Kill Generating StationForward forecasts, scenario decomposition, and risk-decision tooling for this asset.