Search plants, projects, owners, and states
142.8 MW Natural Gas operating in Hall, NE
142.8 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1968
Operating Since
Coordinates
40.9228, -98.3269
County
Hall, NE
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Grand Island - (NE) | — | — |
| Owner(s) | City of Grand Island - (NE) | — | — |
| Status | Operating | — | — |
C.W. Burdick Power Plant is a six-unit 187.5 MW natural gas/fuel oil power plant located in Grand Island, Nebraska. The facility is owned and operated by the City of Grand Island. It serves as a backup to the city's primary generating station, Platte Generating Station.
Read more on WikipediaThe C W Burdick power plant is located in Hall County, Nebraska. The plant has a total capacity of 142.8 MW across three natural gas-fired combustion turbine generators. It began operating in 1968 and is owned and operated by the City of Grand Island. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
In the most recent year with available data, the C W Burdick plant generated 4,824 MWh of electricity, resulting in a capacity factor of 0.4%. Based on capacity, the plant ranks 9th out of 10 power plants in Nebraska and 833rd out of 945 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
159 MWh
Latest Month
4.8K MWh
Annual Generation
0.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2187 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
0.836 lb/MWh
SO₂
0.030 lb/MWh
CH₄
0.125 lb/MWh
N₂O
0.020 lb/MWh
Capacity Factor
0.4%
Annual Net Gen
5 GWh
CO₂eq
2196 lb/MWh
Subregion
MRO West
2013
$965/kW
Est. Construction Cost
Total estimated cost: $137.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Burdick Substation
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
NPPDGI_SUBHGRIS_GT2_RA
Pricing Hub
SPPNORTH_HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about C W BurdickForward forecasts, scenario decomposition, and risk-decision tooling for this asset.