26.7 MW Hydro operating in Cascade, MT
26.7 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1927
Operating Since
Coordinates
47.5213, -111.2614
County
Cascade, MT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NorthWestern Energy (MT Hydro) | — | — |
| Owner(s) | NorthWestern Energy (MT Hydro) | — | — |
| Status | Operating | — | — |
The Black Eagle hydroelectric plant is located in Cascade County, Montana. The plant has a total capacity of 26.7 MW across three generators and began operating in 1927. It is owned and operated by NorthWestern Energy (MT Hydro) and utilizes conventional hydroelectric technology with water (WAT) as its primary fuel source. Black Eagle operates within the NorthWestern Energy (NWMT) balancing authority in the Western Electricity Coordinating Council (WECC) NERC region.
Black Eagle's latest annual generation was 127,466 MWh, resulting in a capacity factor of 54.4%. The plant is ranked 15th out of 23 power plants in Montana and 432nd out of 1464 plants nationally. Financial data indicates an installed cost of $761,496.06 per kW.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
NorthWestern Energy (NWMT) (NWMT)
Grid Voltage
100.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
8.5K MWh
Latest Month
127.5K MWh
Annual Generation
54.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Run-of-river hydro · NorthWestern Corporation · Data from 2015–2024
$1,103/kW
Installed Cost
$6.6/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Black EagleForward forecasts, scenario decomposition, and risk-decision tooling for this asset.