33.2 MW Natural Gas Fired Combustion Turbine (21 MW) + Petroleum Liquids (12 MW) operating in Callaway, MO
33.2 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Petroleum Liquids
1966
Operating Since
Coordinates
38.8682, -91.9477
County
Callaway, MO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City of Fulton - (MO) | — | — |
| Owner(s) | City of Fulton - (MO) | — | — |
| Status | Operating | — | — |
Located in Callaway County, Missouri, the Fulton power plant is a 33.2 MW hybrid facility primarily fueled by distillate fuel oil (DFO). The plant, which also utilizes natural gas fired combustion turbine technology, consists of three generators and began operating in 1966. The plant is owned and operated by the City of Fulton (MO).
The Fulton plant operates within the Associated Electric Cooperative, Inc. balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 161 MWh, resulting in a capacity factor of 0.1%. Fulton ranks as the 13th largest plant out of 38 in Missouri, and 134th out of 886 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Associated Electric Cooperative, Inc. (AECI)
Grid Voltage
13.8 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10 MWh
Latest Month
161 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
2447 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
7 lb/MWh
SO₂
0.067 lb/MWh
CH₄
0.046 lb/MWh
N₂O
0.005 lb/MWh
Capacity Factor
0.1%
Annual Net Gen
0 GWh
CO₂eq
2450 lb/MWh
Subregion
SERC Midwest
2013
$965/kW
Est. Construction Cost
Total estimated cost: $32.0M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Fulton (MO)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.