68.3 MW Distillate Oil operating in Cole, MO
68.3 MW
Nameplate Capacity
1
Generators
unit
Petroleum Liquids
Technology
1974
Operating Since
Coordinates
38.5934, -92.2209
County
Cole, MO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Union Electric Co - (MO) | — | — |
| Owner(s) | Union Electric Co - (MO) | — | — |
| Status | Operating | — | — |
The Fairgrounds plant is a 68.3 MW petroleum liquid-fueled power plant located in Cole County, Missouri. It began operating in 1974 and has one generator. The plant is owned and operated by Union Electric Co - (MO). It is connected to the Midcontinent Independent Transmission System Operator, Inc. balancing authority and is within the SERC NERC region. Fairgrounds is ranked 3rd out of 38 power plants in Missouri, and 80th out of 886 nationally.
In the most recent year with available data, the plant generated 136 MWh of electricity, resulting in a capacity factor of 0.0%. Financial data indicates an installed cost of $92.73 per kW, with the data sourced from FERC filings.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
10 MWh
Latest Month
136 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Gas turbine · UNION ELECTRIC COMPANY · Data from 2015–2024
$91/kW
Installed Cost
$0/kW
Annual CapEx
$2603.3/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
AMMOFGRDCTG1
Pricing Hub
ILLINOIS.HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FairgroundsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.